Asterholma, Finland

  • épülettípus:
  • energetikai szerkezetek
teljes képernyő bezárás

In the summer of 2023, Peikko supplied key foundation components to the Asterholma project in Åland, including one Rock Adapter foundation fully manufactured in Finland.

SUVIC managed the civil works, with Peikko providing 40 pieces of FATBAR® 56 Post-Tensioned Anchors, each 12 meters long, along with one Rock Adapter plate set with short tower bolts for an Enercon E70 turbine.

The Rock Adapter solution features the most compact foundation, reducing concrete use by eliminating the traditional anchor cage.

The FATBAR® Post-Tensioned Anchor offers proven quality as an ETA-assessed and CE-marked product, ensuring a safe and reliable solution. Its compact design is optimized for material efficiency, environmental consciousness, and cost-effective installation. Additionally, the FATBAR anchor simplifies risk management with easy re-tensioning, supporting hassle-free maintenance throughout the foundation's lifecycle.

For more information on FATBAR®, please visit: Peikko.com/fatbar

 

bővebben down-arrow.png

projekt adatok

fejlesztő:
Asterholma Vindenergi AB
kivitelező cég:
Suvic Oy
szállítás éve:
2023
átadás éve:
2023
turbinák száma:
1
turbina gyártó:
Enercon
turbina méret, MW:
E-70 E4/S/69/4F/01 2.8MW
tengelymagasság:
69

Alkalmazott Peikko megoldások

Kapcsolat