Haldor Topsøe, Frederikssund, Denmark

  • épülettípus:
  • ipari épületek
teljes képernyő bezárás

Haldor Topsøe is a world leader in catalysis and surface science.

Haldor Topsøe A/S opened a large extension of the company's catalyst plant in Frederikssund, Denmark.

The concrete columns in the plant is fastened with Peikko PEC® column shoes and PPM® anchor bolts in the foundation that led to fast and effective erection of the structure.

The extension, represents an investment in excess of DKK 300 million, and consists of the addition of a new production unit called "P6", which will focus on the production of catalysts used by refineries worldwide to manufacture ultra-low sulfur diesel.

bővebben down-arrow.png

projekt adatok

projekt mérete:
2500 m2
kivitelező cég:
Viuf A/S
szerkezettervező:
Morten Niemann - Rådg. Civiling. ApS
előregyártó:
Confac A/S
szállítás éve:
2012
átadás éve:
2013

Alkalmazott Peikko megoldások

Kapcsolat

Jonas Høg

Jonas Høg

Direktør

Bygningsingeniør

Mob. +45 5120 5658
[email protected]