The Warehouse City located in Umm Al Quwain free trade zone, the UAE, is a massive complex of 30 warehouse buildings. The flooring of these modern and large storage buildings was made with 2,3 kilometers of Peikko's TERAJOINT®. TERAJOINT® is a prefabricated leave-in-place joint system designed to build formed free-movement joints. It is suitable for all large-area construction methods for ground-bearing and pile-supported concrete floors.